Hidden Hammocks Estates Homeowners
Association BOARD OF DIRECTORS MEETING Integrity Property Management Co. Present: Tom Base – President/Treasurer Scott
Matchunis
– Vice President Tom
Toth
– Secretary Dave
Aronson – Director at
Large Mike
Whittle – Integrity Property
Mgmt.
The
minutes of the March
12th meeting
were approved 4/4 One homeowner was interviewed
for a board position.
The second interviewee
will be rescheduled Two homeowners were
present. They volunteered
to get the 50% vote to
allow aluminum perimeter
fences. Property Management:
̃
The
There was no Treasurer’s
Report Old Business
̃
For the six+ homeowners in or entering legal procedures, IPM
needs to maintain more
timely follow up.
̃
For the two homeowners that requested the allowance of perimeter
aluminum fences, 4/4 agreed
to not change the documents.
̃
For the front gate security, 4/4 approved a $0.30 raise not
retroactive. A certified
letter is to be sent to
Fortress with a cc to
Murdock informing them
of our unhappiness with
the open issues e.g. training
on the post orders, $1/hr
raise, letting people
in without calling homeowners,
… Quotes are needed for
alternate security companies
̃
For the front landscaping, the Top Branch charges were $1300
for the gold mound and
$2240 for the mulch.
̃
For the new guardhouse, MW estimated $40k at $125 - $150/sq
ft. This translates to
around $10/mo/homeowner.
MW estimated $200/mo for
a temporary guardhouse
to be located immediately
behind the present structure
in the turnaround. The
next step is to have Peter,
the architect, at the
next meeting to review
the proposal, discuss
landscaping, ornamental
vertical gates, and other
peripheral issues. Then
the $6,200 architect fee
would be voted on. An
entrance side overhang
similar to King’s Point
was proposed.
̃
For HHE house colors, 4/4 agreed to disapprove the bright yellow
on Rothschild. A letter
is to be sent. No wild
door colors are allowed
such as bright blue or
green. Dark brown is approved.
̃
For the new mailboxes, a letter is to be sent to homeowners
that the cost of the mailbox
is $408 if not ordered
by May 1st.
A note to remove plantings
from around mailboxes
should be included in
this letter.
̃
For the pipes in the lake, Pinetree
is to be contacted about
a pump system to allow
water to flow back into
the HHE lakes to maintain
the level. The next BoD meeting is Wednesday, May 14th at |
||